Perhaps, start work on the masonry of the walls should begin with the preparation of the so -called mounting plan. The formula is extremely simple: the length and height of the wall should be 100% consistent with the number of whole stones. Such a simple calculation makes it possible to avoid such a laborious procedure as breaking stones. In addition, during construction, it should be noted that the width of the foundation properly corresponds to the width of the walls. Next, it will be necessary to mark up according to the drawn up plan of the house. The sequence of your actions is as follows: external walls, then already internal. It is recommended to check the diagonals several times in order to make sure their length is really equal.
Then, along the marked wall, literally every 2 meters, lay the stocks of stone and containers directly for the solution. The cement mortar for the stone wall is more correctly made in this way: pour water into a fairly comfortable container, pour cement, after pour and sand and sand. When the mixture is mixed, leave it for 20 minutes, and then mix again. It is customary to start masonry with the outer corners of the house. To make the row quite even, between the corners of the potential house you should pull the thread. Keep in mind that the correct installation of the so -called corner stones is measured by means of plumbing and a special building level. So, on the upper surface of the stone (moistened), apply two strips of solution at once with a cell. Next, take the stone with both hands, gradually turn 90 degrees, and then press tightly to the already laid. Remove the excess solution.